Senior MEP Manager

First Name: Kok Fu
E-Mail Address: kfgan_77@hotmail.com
Country: Malaysia
Phone: +60127803381
 

Job Position Applying For: Senior MEP Manager
Current Job Title: MEP Manager
Total Years of Experience: 20
 

Copy your Resume / CV in this box: Work Experiences
1.      Electrical & System Department Head: September 2018 – Present, Karisma Project Management Inc. under Muhibbah Engineering (Malaysia) Corporation
•       Review and monitor the feasibility study, preliminary design of airport master plan, determining parameters of the airport covering airport special system and locations
•       Review and monitor the design development of airport master plan, coordinate with the airport designer and 3rd party design reviewer, consolidate the design review report and presentation to the client on the progress of the design development and highlight any potential challenges with solution
•       Review concept and preliminary design report of airport expressway, coordinate and agreed with the design consultant on planning & design parameter, basic engineering & data collection and highlight any potential challenges with solution
•       Undertake site visit and assessment on New Manila International Airport project location studying logistic and analyze risk that might affect the success of the potential project
•       Lead and undertake the general arrangement layout planning of PMC site office, staff accommodation, Contractor laydown area, material storage and workers accommodation
•       Develop and review of project management plans and policies, document control procedures to support the achievement of the project objectives
•       Monitor the progress on the Consultants deliverables throughout the duration of the project to ensure compliance to quality and management document standards
•       Attend weekly alignment meeting in relation to power/water supply business model strategy, airport special system requirement and introduce of new cutting-edge technology for the airport project as to establish and understand the Client’s requirement
•       Assisting procurement team on the preparation of term of reference (TOR) prior to awarding contract to consultants
•       Lead MEP team to support commercial team on the budget preparation and providing capital, operation and maintenance cost estimations of the airport
•       Liaise with Client’s internal team as to understand the logistic requirement and coordinate with various department personnel to kick start the planning process of the project execution
•       Support Project Director with the management of client relations and expectations, responding to client clarifications and technical issues related to airport system design, client presentation and workshops as needed
•       Lead airport master planner and team of designers to develop airport utilities, airport system concept design, including all required drawings and reports

Project Involved
New Manila International Airport, contract values approximately USD 14 billion. The project scope includes of Passenger Terminal Building, Airside works comprise of Taxiways, Runways, Aircraft Traffic Control Tower. Landside works comprise of Ancillary Buildings, Sewerage Treatment Plant, Cargo Terminal, MROs, GSE Maintenance, Freight Forwarding Facility, Fuel Farm, Airport Aviation Facilities, Catering facilities and Marine work.


2.      MEP Manager: January 2018 – August 2018, Leighton Contracting Qatar
•       Lead and managing project team including subcontractors and vendors to assist them in working to the success of the project
•       Attending weekly construction meeting with client, PMC and consultant, reporting the site progress, highlighting the area of concern in regard to critical engineering submittal, safety matters, progress claim, construction issue to pursue for quick solutions
•       Provide leadership and coaching for the MEP staff to enable them to achieve high work performance standard and acquire technical competencies
•       Review contract documents, making suggestions, modifications related to MEP & civil trades
•       Liaise with local authority Kahramaa, Ashghal, Woqod and MOI submission and preparation for the authority field inspection 
•       Ensure execution works are in compliance with specification, codes and standards, quality and safety standards
•       Assist planning department with developing detailed construction schedule for all MEP installation activities, including cost and resource loading programme

Project Involved
PRPS-3 Rawdat Rashed Mega Reservoir Qatar, contract values approximately USD 550 million. Project scope of work include engineering, procurement, delivery, supervision, installation, testing and commissioning of 5 nos. reservoirs with capacity of 100 million gallons each, the largest reinforced concrete reservoir in the world equipped with electro-mechanical system, instrumentation system, electrical & ELV system, HVAC system, plumbing & drainage system, fire-fighting system within main pumping station building, MV & LV substations, surge vessel, air compressor building, chlorination building, water quality building, valve chambers, drainage lagoon and maintenance work shop building. The construction of total 8.25KM length of ductile iron pipe and 5KM length of cast iron process pipeline is connected to 5 nos. of MVVFD pump and 4 nos. of LVVFD pump.

3.      Sr. MEP Project Manager: July 2016 – January 2018, SEF Construction PTE LTD Qatar
MEP Project Manager: October 2015 – June 2016, SEF Construction PTE LTD Qatar
•       Lead and manage SEF project team, subcontractors and vendors to assist them in working to the success of the project
•       Develop project plan and schedule, policies and procedures to support the achievement of the project objectives
•       Set up and establish MEP project organization, identify the roles and arrange assignment for project personnel
•       Provide leadership and coaching for the MEP staff to enable them to achieve high work performance standard and acquire technical competencies
•       Defining project baseline, tracking project progress and reporting the project status to management, taking the corrective action to address the deviation
•       Outline work plan, to assign duties, responsibility and scope of authority
•       Efficiently confer with each of project manager’s to provide technical advice and resolve problems
•       Responsible to project stakeholders for delivering the project objective within scope, schedule, cost and quality
•       Liaise with local authority Kahramaa, Ashghal, Woqod and MOI submission and preparation for the authority field inspection 
•       Monitoring the project turnover documents including O&M Manual, As-built drawing and provide system operation training to the operator

Project Involved
Ezdan Palace Hotel Qatar, contract values approximate USD 78 million. Ezdan Palace Hotel consist of total 194 various type guess rooms and luxury presidential suite room with main bulk kitchen, all day dining restaurant, Thai restaurant, Italian restaurant, business centre, meeting rooms and banquette hall. Project scope of work including refurbishment of existing apartment and upgrade to five starts hotel, demolition and salvage existing MEP material as specified in the drawing and BOQ, upgrade, making good, re-install salvage MEP material including equipment’s, piping and accessories, cable and wire, supply and installation of new MEP equipment’s with associated accessories and testing & commissioning the whole MEP system to meet MZP consultant design intend and compliance to the project specification and local authority requirement.


4.      MEP Construction Manager: Jun 2011 – September 2015, CDC- Takenaka JV, Qatar
      Sr. MEP Engineer: Oct 2008 – May 2011, CDC- Takenaka JV, Qatar
•       Coordinate and oversees the engineering design, bridging together with architects, structure engineers, and MEP engineers, along with specialist engineers to produce coordinated design
•       Design review, optimization and provide technical evaluation for MEP system ensuring the design meet current legislation, standard and code of practise prior to issuance of IFC drawing
•       Supervision of the installation, testing and commissioning of MEP system and coordination with airport systems to the success of the project
•       Estimate and scope MEP trades during pre-construction
•       Resolve design anomalies between different disciplines based on construction drawing. Monitor and review all shop drawings and raise Request for Information (RFI) to consultant/designers for resolving anomalies
•       Review contract documents, making suggestions, modifications related to MEP trades
•       Manage and lead MEP subcontractor throughout duration of the project (from groundbreaking through commissioning and turnover to client)
•       Ensure execution works are in compliance with specification, codes and standards, quality and safety standards
•       Monitor subcontractor progress ensure that the project is progressing in aspects of cash flow, safety, quality and time
•       Assist planning department with developing detailed construction schedule for all MEP installation activities, including cost and resource loading
•       Certify the change order and negotiate with relevant subcontractor on contractor matter and evaluate bids
•       Lead and direct BIM 3D modelling coordination process to resolve all conflict prior to the installation
•       Review the submission engineering submittals during construction stage and coordinate with PMC and Contractor in preparation of O&M Manual submission and arrangement of system training to airport operator
•       Monitor the progress of closure of Quality Action Note (QAN) and project snagging during the defect liability period
•       Involve local authority inspection (QCDD), experience in preparing all necessary document’s for QCDD submission and field preparation


Project Involved
New Doha International Airport, contract values approximately USD 3 billion. Project scope of work were included 2 packages 1) Engineering, procurement, installation, testing & commissioning of Emiri terminal, parking structure and mosque 2) Design and built package includes Emiri gate, ramp facilities, VVIP check point, lagoon fountain in which including design verification and construction of massive architecture building of Emiri terminal with high quality finishing and standard, complete and coordinate of MEP system including major HVAC system (Chiller, VFD chilled water pump, package unit, AHU, FAHU, FCU), Plumbing system (End suction pump, Sump pump and irrigation pump), Fire-fighting System (Pre-action system, Deluge system, FM200 system, Form system), Drainage and Storm water system, Baggage Screening System, Passenger Loading Bridge, Electrical system (11KV substation, Transformer, Generator, LV switchgear, MDB, SMDB and DB), Lighting control system,  ELV system (Airport special systems, fire alarm system, Master clock system, Public address system, CCTV and airport security system, BMS, Voice & Data, IP-telephone system, UPS system, Screening X-Ray system, BHS,  and etc.)

5.   M&E Manager: Apr 2007 – Sep 2008, Putra Perdana Construction Sdn Bhd, Malaysia
•       Implement all policies, activities, procedures, instruction, as relevant and requirement by Quality Management System (QMS) and Occupational Health and Safety Management System (OHSMS)
•       Manage, deliver and offer solution to senior management for the MEP services, to ensure that the smooth operation of the project
•       Lead and manage architect and consulting engineers to develop the concept design for UTeM project and to provide technical advice and budget control during conceptual design throughout the project
•       Attend design meeting with PMC and client for presentation of concept design to get design approval from client
•       Presentation of sample of material to client and to get approval of material’s selection
•       Monitor the design, construction, installation & commissioning of all MEP services
•       Responsible for the overall planning of M&E works
•       Liaison with designer and project manager to review better engineering solution to minimize time and increase efficiency
•       Overseeing the creation of installation and builder work drawings and M&E construction drawing
•       Overseeing the production of method statement and record all submission drawings
•       Attend necessary F.A.T for switch gear, transformer, generator, MDB
•       Attending regular progress meeting and defect meeting with client and PMC
•       Ensuring regular progressive site inspection checklists and implemented and recorded
•       Participate in final handover inspection with client, PMC and architect
•       Liaise with the Engineer’s for the submission of necessary document to local authorities

Project Involved
University Technical Malaysia Melaka Campus, contract values USD 145 million. Project scope of work comprise of the following building and infrastructure work:
1)      Design and built of HV and LV substations including supply, installation, testing and commissioning all transformers, MV & LV switchgears to facilitate power supply to the building and infrastructure facilities   
2)      Design and built of connecting highway road and drainage, street lighting and University compound lighting to the government access road
3)      Design and built of sewerage treatment plant complete with underground sewerage piping system for the University   
4)      Design and built of Sport complex with running track, soccer field, badminton court and hockey field
5)      Design and built of Chancellery office building, computer center, faculty of Information and communication technology building, library, conventional hall, language and human development center, development office, center of graduate studies, cafeteria staff and student, staff quarter and mosque


6.   Project Manager: Aug 2005 – Mar 2007, Sekata Tulin Sdn Bhd, Malaysia
•       Develop overall construction program, generate milestone and exemplify detail activity to achieve early complete of project
•       Lead a project team for fabrication & Installation of Topside & Jacket
•       Planning & execution of management work, listing of activities in detail for progress control & regular reporting progress of work and number of workers
•       Effective supervision for high productivity & work progress
•       Attend safety meeting and site walk for finding near miss and improve safety precaution
•       Implement the best worker programme to encourage all worker to work in a safe environment by prioritize safety first campaign, improve the quality of work and ensure ‘the best worker programme satisfy health, safety and welfare requirement
•       Close coordination with main contractor to identify & resolve problems early
•       Ensuring that the project is executed in a safe & professional manner & the work meet main contractor / client standard of quality & workmanship

Project Involved
Supply of skills workers, supervision, planning, fabrication & Installation of Topside and Jacket platform for Qatar Petroleum, contract value approximate USD 4.8 million.

7.   Project Manager: May 2004 – Jul 2005, Pumpfield Corporation Sdn Bhd, Malaysia
•       Project planning, implementation, co-ordination and management
•       Manage, deliver and offer solution to management for the M&E services, to ensure that the smooth operation of the project
•       Monitor the construction, installation & commissioning of M&E services
•       Responsible for the day-to-day operation and overall management of projects
•       Operation management for a team of technicians & engineers
•       Design coordination of mechanical and electrical system
•       Managing and lead the service department for routing maintenance works
•       Prepare electrical design drawings and specifications

Project Involved
With Pumpfield Corporation multi millions project involves delivery of engineering, construction management, supervision, installation, testing and commissioning of the following projects:
1)      Engineering, supply and installation of new set booster pump system including piping and electrical starter panel and instrumentation panel for new pump house and elevated water reservoir at Bukit Jail, Kuala Lumpur
2)      Engineering, supply and installation of three (3) sets of new vertical inline water pump including piping system, MCC panel, instrumentation panel, earthing and lighting protection system for new raw water intake pumping station at Sekinjang, Selangor
3)      Refurbishment and upgrade the existing pump house and replacing instrumentation components of water reservoir at Bandar Enstek, Selangor
4)      Engineering, supply and installation of new and complete mechanical equipment’s, electrical MCC panel and instrumentation of new waste water treatment plant at Bukit Raja, Klang
5)      Engineering, supply and installation of new set booster pump system including piping and electrical starter panel and instrumentation panel for new pump house and elevated water reservoir at Pulau Indah, Selangor
6)      Engineering, supply and installation of new and upgrade flood gate control system with rotork electrical control actuator valve and link with electrode control system at Kota Kemuning, Shah Alarm
7)      Engineering, supply and installation of new and complete mechanical equipment’s, electrical MCC panel and instrumentation of new waste water treatment plant at Setapak, Kuala Lumpur
8)      Supply and install of booster pump system including piping and electrical starter panel and instrumentation for multiple high rise building and factory projects in Selangor and Kuala Lumpur area

8.    Project Engineer: Jan 2002 – Apr 2004, Makiansia – Taikisia JV, Malaysia
•       Project planning, scheduling, co-ordination works
•       Take offs of major materials, planning and forming of material loading schedules for different areas
•       Operation management of subcontractors works
•       Plan and estimate cost on project
•       Preparation of O&M and as build drawings
•       Perform testing and commission on electrical and mechanical system
•       Manage and lead MEP subcontractor throughout duration of the project (from groundbreaking through commissioning and turnover to client)

Project Involved
Proton City Car Plant, contract value USD 50 million comprise of PT-ED pre-treatment coating equipment, oven equipment, spray booth, automatic paint robotic, automatic conveyor system, spray painting system, cleanroom, automatic car storage system 

9.    Project Engineer: Sep 1999- Dec 2001, Kejuruteraan Trolka Sdn Bhd, Malaysia
•       Liaising with consultant for approval of material submittal and sample submission
•       Project planning, scheduling, site co-ordination work
•       Costing and budgeting
•       Preparation of shop drawings and material submittals
•       Perform testing and commission on electrical and mechanical system

Project Involved
Ministry of Entrepreneur Putrajaya high rise office block, contract value USD 2.5 million. Project scope of work include engineering, procurement, supervision, construction, installation and testing & commissioning of fire alarm system and fire-fighting system

No comments:

Post a Comment